Your interfaces are the migration

Everyone plans the ERP conversion. Very few companies have a current list of what feeds it, and that list is where the programme actually lives.

Key Takeaways
  • A mid sized ERP landscape typically carries several dozen interfaces, and many are undocumented and unowned.
  • Table structures and field behaviour differ between generations, so an interface that runs today may run differently rather than fail visibly.
  • Finance owns most of the interfaces that matter, because they carry transactions into the ledger.
  • The inventory is the first deliverable and it is usually assembled by finance rather than by IT, since finance knows what the data means.
  • Interfaces that silently drop or transform a field are the failure mode to design tests around, not the ones that error.

Ask how many interfaces feed your ERP and you will get an estimate. Ask for a list and you will get a partial one, assembled from memory, missing the file transfer somebody set up for a subsidiary in 2019.

That gap is not unusual and it is the single best predictor of how a migration goes. The conversion of the ERP itself is a defined exercise. The conversion of everything that talks to it is not.

Most of those flows carry transactions that end up in the ledger, which makes the inventory a finance deliverable whatever the programme structure says.

ERP MigrationIntegrationsData FlowsReconciliationPlanning
01

Why interfaces dominate the timeline

An ERP replacement has a defined scope. The systems around it accumulated over fifteen years, were built by different people for different reasons and are documented unevenly at best.

Table structures differ between platform generations, so direct database access and remote calls have to be verified individually rather than assumed to carry across.

Message based interfaces often remain broadly compatible while mapping logic and field rules change, which produces the worst kind of failure: one that does not error.

That is why the inventory has to be built before the design is fixed, in the same way that the finance requirements described in the December 2027 deadline have to arrive early.

Colleagues reviewing financial documents in an office
The ERP conversion is scoped. What feeds it is discovered.
02

Four categories worth separating

Treating all interfaces as one population produces a list nobody can prioritise. Four categories make the risk visible.

Transaction feeds into the ledger: Billing, payroll, expenses, point of sale and bank data. These carry postings, so a change here changes reported numbers.
Master data synchronisation: Customer and supplier records flowing between systems, which is where duplicate records are created and propagated.
Extracts for reporting: Data leaving the ERP for analytics, statutory reporting or regulatory submissions, which fail visibly and late.
Manual file transfers: Spreadsheets uploaded on a schedule by a person. Rarely documented, frequently critical, and the ones nobody thinks to list.
03

The failure mode to design for

An interface that stops working is an inconvenience. It is noticed within a day and fixed within a week.

An interface that keeps working while dropping a field, truncating a value or applying a different default is a reconciliation problem discovered at the following close, or later.

That is why interface testing should compare outputs rather than confirm execution. A test that proves a file was received proves very little.

Keeping the evidence of those comparisons matters too, since a question about which version of a mapping was live in March is exactly the document you cannot find.


The interface ran successfully. One field arrived empty and nothing said so.
04

Building the inventory

Five columns, one row per flow. This is the single most useful artefact finance can produce for a migration programme.

ColumnWhat to recordWhy
Direction and frequencyInbound or outbound, and how often it runs.Determines the test window and how quickly a break would be noticed.
Accounting consequenceWhether the flow results in a posting, and to which accounts.Separates the interfaces that change reported numbers from those that do not.
Owner and fallbackWho maintains it and what happens manually if it stops.Reveals which flows have no fallback at all, which is the real risk list.

Interface behaviour between platform generations depends on the specific technologies in use. Confirm the technical position with your implementation partner rather than assuming compatibility.

"

The ERP conversion is planned. The eighty things that feed it are discovered.

ChatFin
05

A sequence that finds the surprises early

The objective is to discover the unknown flows while there is still time to plan for them, which means starting from the data rather than from a list.

Start from the postings, not the systems

Look at what posts to the ledger from a non manual source in a month. Every one of those has an interface behind it, including ones nobody has mentioned.

Interview the closers

The people who close the books know which files arrive, which are late and which are corrected by hand each month.

Rank by accounting consequence

A flow that posts revenue matters more than one that updates a description field, and that ordering is finance judgement.

Test by comparison

For each in scope flow, compare the output of the old and new interface on the same input, field by field, rather than confirming that it ran.

Hands holding financial documents beside a calculator
Testing by comparison finds the field that arrives empty. Testing by execution does not.
06

Two things worth deciding early

Both come up in every migration and both are cheaper to decide than to discover.

Decision

What does not move

Some interfaces exist because a system exists that is itself being retired. Deciding that early removes work rather than converting it, and it is finance that usually knows.

Decision

Where the mapping lives

Field mapping held inside a middleware tool nobody in finance can read is a dependency that outlives the programme, which is a version of the master data problem.

07

How ChatFin sits alongside interfaces

We connect to the ERP as a system of record rather than to the interfaces feeding it, which is a deliberate design choice during a period of change.

Reads the ledger, not the pipes: Reconciliation and preparation work from the posted data in NetSuite, SAP Business One, JD Edwards, Acumatica, Dynamics 365 and Sage Intacct, so an interface redesign underneath does not require rebuilding it.
Surfaces the gaps a feed leaves: Missing or inconsistent postings appear as reconciliation exceptions, which is often how a quietly broken interface is first noticed.
Continuity across two systems: During a cutover both environments can be read, which matters most in the periods covered by the cutover year close.

Interface design, middleware and the conversion itself belong to your implementation partner, and the inventory described here is worth building whether or not anything is automated, particularly where custom code has become policy.

Free tool

AI Cost Estimator for the CFO Office

Four inputs. A first year range, a timeline, and three delivery models compared. No login required.

Frequently Asked Questions

How many interfaces should we expect to find?

More than the initial estimate. A mid sized landscape commonly carries several dozen flows once manual file transfers and departmental extracts are included, and the ones missing from the first list are usually the ones with no owner, which makes them the higher risk.

Why should finance build the inventory?

Because finance knows which flows result in postings and which do not. An inventory ordered by technical complexity is much less useful than one ordered by accounting consequence, and only finance can produce the second.

What is the most common interface failure in a migration?

Silent degradation. The interface runs, the file is accepted and a field arrives empty or transformed. Nothing errors, so the problem surfaces as an unexplained reconciliation difference at the following close rather than as an incident.

Should we rebuild interfaces or replace them?

It depends on whether the source system survives the programme. A meaningful number of interfaces exist to serve systems that are themselves being retired, and identifying those early removes work rather than converting it. That judgement usually sits with finance rather than with IT.

Start from the postings

The inventory is the deliverable that decides the timeline.

Working backwards from what posts to the ledger, ranking by accounting consequence and testing by comparison will find the surprises while there is still time to plan for them.

If you want a first year range for reconciliation that spans two ERPs during a transition, the estimator gives one in about a minute.

Open the estimator
Book a Demo
Put it on your own numbers

See what this looks like in your ERP.

We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.

✓Runs on the ERP you already have, on the version you already run
✓Every action prepared as a draft that a person approves before it posts
✓A first phase scoped against your real workflows, not a generic package
Schedule a Demo
Confidential & private

This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.

Photos by Artem Podrez and RDNE Stock project, free to use under the Pexels License (commercial use, no attribution required).