When the hour gets cheaper the WIP report gets harder
Hourly billing made revenue recognition trivial. Every alternative to it requires a measure of progress somebody has to define and defend.
- Time and materials billing makes revenue recognition close to mechanical, because hours worked and revenue earned are the same measure.
- Fixed fee and outcome based pricing separate the two, so progress has to be measured some other way.
- Industry benchmark work reported billable utilisation below optimal levels and pressure on margins while AI reshapes delivery.
- Cost to cost measurement is the common alternative and it depends on an estimate to complete, with the same governance issues as construction.
- The work in progress balance becomes an estimate rather than a record, which changes the review it requires.
Hourly billing has been criticised for decades on the grounds that it rewards inefficiency. Less often noted is how much administrative simplicity it provided.
Hours worked equalled work in progress equalled revenue, subject to write offs. The measure of progress was the same measure as the billing, and nobody had to define anything.
As firms move to fixed fees, capped fees and outcome pricing, that identity breaks, and the accounting has to be rebuilt around a measure of progress that is no longer time. Most firms make the pricing change first and discover the measurement problem in the first close afterwards.
What changes when the fee is fixed
Under time and materials, revenue for a period is the hours worked at agreed rates, and the unbilled balance is simply time not yet invoiced.
Under a fixed fee, revenue for the period is the proportion of the engagement completed, applied to the fee, which requires a measure of completion. Where the deliverable is a system or a piece of software, the same engagement may also carry usage based elements, which brings in the questions raised by usage based billing.
The most common measure is cost to cost: costs incurred as a proportion of estimated total costs, which requires an estimate to complete for every open engagement.
That is the same structure used in construction, with the same dependence on estimates described in the estimate at completion.

Four consequences for a services firm
Each of these follows from the separation of hours from revenue.
The estimate problem arrives
Cost to cost measurement means every open engagement needs an estimate of remaining effort, supplied by the person running it.
Those estimates carry the same incentive issues as any other: the engagement leader is measured on margin, and the estimate determines the margin reported this month.
Firms moving from hourly billing frequently underestimate how much governance this requires, because it was never necessary before. The estimates behave exactly like those in a construction work in progress schedule, and the same reporting discipline applies, which is why close metrics that change behaviour is the relevant reference rather than a services specific one.
Industry benchmark work published in 2026 reported utilisation below optimal levels and margin pressure across mid market firms, which makes the accuracy of these estimates more consequential rather than less.
The pricing model changed. The measurement model has to change with it.
Three progress measures
The choice depends on the nature of the work and on what can be evidenced.
| Measure | Where it fits | Weakness |
|---|---|---|
| Cost to cost | Engagements where effort is the main input and can be tracked reliably. | Depends entirely on the estimate to complete. |
| Milestones | Work with discrete, verifiable deliverables agreed with the client. | Lumpy recognition, and it requires milestones that reflect value rather than convenience. |
| Time elapsed | Retainer style arrangements where the service is provided continuously. | Only appropriate where effort is genuinely even over the period. |
Revenue recognition for services depends on the contract terms and the applicable framework. Confirm the measure of progress and its application with your auditors.
Hours were the price and the progress measure at once. Only one of those was replaced.
ChatFinRebuilding the measurement
Four steps for a firm moving away from hourly billing, in the order that causes least disruption.
Choose a measure per engagement type
Rather than one measure for the whole firm, since a fixed fee advisory project and a retainer behave differently.
Keep recording time anyway
Time remains the best available input to cost to cost measurement and to future pricing, even where it is no longer billed.
Collect estimates on a cadence
Monthly, in a structured form, with the version retained so accuracy can be reviewed, as in the dimensions you never populate.
Replace utilisation as the headline metric
With realised margin per engagement and per person, which is what the new model actually rewards.
Two transitional difficulties
Both appear in the first year of a pricing change and both are manageable if anticipated.
Timekeeping compliance falls
People stop recording time carefully once it does not drive billing, which removes the input the new measurement depends on. This has to be addressed explicitly.
Write offs disappear as a signal
Under hourly billing, write offs flagged problem engagements. Under fixed fees the same problem appears as margin erosion, which is less visible and arrives later.
How ChatFin supports services measurement
The recognition judgement is yours. The assembly of cost, estimate and revenue by engagement is what we prepare.
The measure of progress, the estimates and the recognition policy remain decisions for your team and your auditors.
AI Cost Estimator for the CFO Office
Four inputs. A first year range, a timeline, and three delivery models compared. No login required.
Frequently Asked Questions
Why does fixed fee pricing complicate revenue recognition?
Because revenue is no longer the same measure as the work recorded. Under time and materials, hours worked at agreed rates give both. Under a fixed fee, revenue depends on the proportion of the engagement completed, which has to be measured and supported separately.
Should we keep recording time?
Yes, in almost all cases. Time remains the most practical input to cost to cost measurement and it is the basis for pricing future engagements. Timekeeping compliance does tend to fall once time stops driving billing, which has to be managed deliberately.
What replaces utilisation as a metric?
Realised margin per engagement, and margin contribution per person. Utilisation measures activity, which mattered when activity was revenue. Under fixed fees, efficiency improves margin, so the metric should measure margin rather than hours.
How do we govern the estimates?
The same way construction firms do: retain every estimate version, report movement in estimated engagement margin monthly and review estimator accuracy on completed engagements. The incentive issues are identical and so are the controls.
Hourly billing gave you a progress measure for free.
Selecting a measure per engagement type, keeping time recording alive and governing the estimates as construction firms do is what makes the transition workable.
If you want a first year range for engagement level assembly and progress calculation, the estimator gives one in about a minute. The practical test is whether someone outside the team could reach the same answer from the records you keep, which is usually a stricter standard than the one applied internally.
Open the estimatorBook a Demo
See what this looks like in your ERP.
We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.
This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.