Two people working on laptops in a busy office
Controls · Release cadence

Two upgrades a year is a control environment problem

Nobody wants to go back to five year upgrade cycles. The cost of the current model is that control documentation is always slightly out of date.

Key Takeaways
  • Cloud ERP platforms typically ship two major releases a year, on the vendor's timetable rather than the customer's.
  • Control descriptions written against a specific screen or workflow become inaccurate when the behaviour changes underneath them.
  • The preview window is the only opportunity to test before a change reaches production, and it is rarely diarised by finance.
  • Auditors increasingly ask how change to the system is governed when the customer does not control the change.
  • Describing controls by objective rather than by screen makes them survive a release, which is a documentation choice rather than a technical one.

The move to cloud ERP removed a lot of pain. Upgrade projects that consumed a year, version fragmentation across a group, and the slow accumulation of unpatched software.

It introduced a smaller and more persistent problem. The software changes twice a year, on a schedule you do not set, and your control documentation was written against a version that no longer exists.

That is manageable. It is not automatic, and the companies that manage it well do one specific thing differently.

Internal ControlsERP ReleasesTestingAuditChange Management
01

What actually changes in a release

Most of a release is additive and irrelevant to your processes. A smaller part changes behaviour in something you use, and a smaller part still changes behaviour by default.

Default on changes are the population that matters, because they alter what happens without anyone deciding, as described in the 2026.2 release overview.

Alongside them sit changes to standard reports, field behaviour and validation, each of which can affect a control that depends on the old behaviour. None of these is announced as a control change, because from the vendor's point of view it is a product improvement, and the customer is the only party who knows which behaviours a control description relies on.

None of this is hidden. It is published in release notes that run to hundreds of pages, which is why it goes unread.

Colleagues working together on financial documents
Most of a release is irrelevant. The default on changes are the population that matters.
02

Four ways a release undermines documentation

Each of these is a documentation problem rather than a software problem, which is good news because documentation is cheaper to fix.

Screen level descriptions: A control described as a check performed on a named screen becomes inaccurate the moment the screen changes.
Report dependencies: A control that relies on a standard report breaks quietly when the report is amended, which is the pattern in documents nobody can find.
Threshold and validation changes: Values enforced by the system may change behaviour, and the control description assumes the old enforcement.
New capability, unchanged description: A feature is enabled that changes who does what, and nobody updates the control, which is how workflow drift starts.
03

Describing controls so they survive

A control described by objective states what has to be true: that every payment above a threshold is approved by someone other than the preparer, for instance.

A control described by mechanism states how: that the approver clicks approve on a named screen. The first survives a release, the second does not.

Objective based descriptions are also easier to test, because a tester can evidence the objective in whatever way the current system supports. They also survive a change of system entirely, which matters for any company that expects to move platform within the life of its control documentation.

The cost is that the description is less specific, which some auditors dislike. That is a conversation worth having once rather than a reason to keep rewriting documentation twice a year, and it sits alongside controls over an autonomous process.


Describe what must be true. Leave how it is achieved to the version of the software you are running.
04

A release routine that fits in a week

Twice a year, one week each time, split between three roles.

ActivityOwnerTiming
Filter the release notes to modules in useFinance systems owner.As soon as notes are published, well before the preview window closes.
Test customisations and key reportsWhoever maintains them, with a finance tester.During the preview window, in a preview account.
Update control descriptionsControl owner, with internal audit if you have one.Before the release reaches production, not after the next audit.

Audit expectations around vendor managed change differ. Agree with your auditors how you evidence control over changes you do not initiate.

"

The software is current. The control description is describing last year's screen.

ChatFin
05

Answering the auditor's question

The question is how you govern change you do not control, and it has a straightforward answer if you have prepared one.

Show the release monitoring

Evidence that release notes are reviewed each cycle by a named person against the modules in use.

Show the testing

What was tested in the preview account, by whom, and what was found. A short document per release is sufficient.

Show the decisions

Which opt in features were enabled or declined and why, which also prevents settings from ageing unnoticed.

Show the documentation update

Control descriptions amended where behaviour changed, dated before the release reached production.

A finance professional counting notes in an office
Objective based descriptions survive a release. Screen based ones do not.
06

Two organisational answers

The difference is whether release management has an owner in finance or only in IT.

Model

IT owns the release

IT reads the notes and tests technically. Behaviour changes affecting finance processes are found in production, usually during a close.

Model

Finance owns the finance impact

A named finance systems owner filters the notes, coordinates testing of finance processes and triggers documentation updates, which is a fraction of a role and prevents most of the pain.

07

Where ChatFin helps with release churn

A stable preparation layer above a changing platform reduces how often control descriptions have to be rewritten.

Process defined outside the ERP: Reconciliation and preparation logic lives in ChatFin, so a change to an ERP screen does not change the control description.
Consistent evidence format: The record of what was prepared, reviewed and approved has the same shape regardless of which platform or version produced the data.
Several ERPs, one model: NetSuite, SAP Business One, JD Edwards, Acumatica, Dynamics 365 and Sage Intacct behave differently and the control model does not, which matters during transitions like a cutover year.

Release testing of the ERP itself, and the decision about which features to enable, remain yours.

Free tool

AI Cost Estimator for the CFO Office

Four inputs. A first year range, a timeline, and three delivery models compared. No login required.

Frequently Asked Questions

How often do cloud ERP releases arrive?

Typically twice a year for major releases, with smaller updates in between, on the vendor's schedule. Each major release usually has a preview window in which a test account is available, and that window is the only opportunity to test behaviour before it reaches production.

Do we have to test every release?

Not exhaustively. The useful scope is the default on changes affecting modules you use, your own customisations and any standard report a control depends on. That is a week of work twice a year rather than a testing programme.

How should controls be documented for cloud software?

By objective rather than by mechanism. A control that states what must be true survives a change in how the software achieves it. Screen level descriptions have to be rewritten every time the interface changes, which is why they are always out of date.

What do auditors expect?

Evidence that you monitor releases, test what matters, decide about optional features deliberately and update documentation when behaviour changes. The specific expectation varies, so agree the approach with them rather than assuming a general answer applies.

Describe the objective

The software changes twice a year. The documentation should not have to.

Objective based control descriptions, a diarised preview window and a named finance owner for releases turn a recurring problem into a routine.

If you want a first year range for a preparation layer that stays stable across releases, the estimator will produce one before any scoping.

Open the estimator
Book a Demo
Put it on your own numbers

See what this looks like in your ERP.

We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.

✓Runs on the ERP you already have, on the version you already run
✓Every action prepared as a draft that a person approves before it posts
✓A first phase scoped against your real workflows, not a generic package
Schedule a Demo
Confidential & private

This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.

Photos by Pavel Danilyuk, free to use under the Pexels License (commercial use, no attribution required).