Hands using a calculator next to folders and documents
AI news · Non-profit finance

The grant rulebook is being rewritten again

Less than two years after the last overhaul, the rulebook governing federal awards was proposed for rewriting again.

Key Takeaways
  • A proposed replacement for the federal grants regulation was published in the Federal Register on 29 May 2026, with comments closing on 13 July 2026 and a proposed effective date of 1 October 2026.
  • The financial machinery is largely unchanged: the de minimis indirect rate, the single audit threshold and the equipment threshold set in the 2024 revision were not proposed for amendment.
  • The movement is in the discretionary layer covering how agencies issue, condition and terminate awards.
  • The proposal includes a preference, all else equal, for institutions with lower indirect cost rates in discretionary awards.
  • For a finance team the immediate work is award terms and closeout discipline rather than a rate recalculation.

Grant finance teams spent 2024 and 2025 implementing a substantial revision to the federal grants rulebook. Thresholds moved, elections were made and policies were rewritten.

In May 2026 a proposed replacement was published, which is an uncomfortable sequence for anyone who has just finished the last one.

The useful news is that the parts that determine your numbers were largely left alone. The parts that determine how awards are issued, conditioned and ended were not.

GrantsNon-profitComplianceFederal AwardsUniform Guidance
01

What was proposed and when

The proposal was published in the Federal Register on 29 May 2026, with a comment period closing on 13 July 2026 and a proposed effective date of 1 October 2026.

It would replace the existing framework with a new regulation and give parts of it the force of regulation rather than guidance, which changes how consistently agencies must apply it.

It does not propose changes to the indirect cost rate negotiation system, and the preamble indicated that appropriations language preserved existing negotiated rates.

It does introduce a preference, all else being equal, for discretionary awards to institutions with lower indirect cost rates, which is a policy signal rather than a rate change. For an organisation weighing whether to negotiate a rate or elect the default, that signal is worth factoring in alongside the analysis in claiming the de minimis rate.

A person reviewing documents and using a calculator
The second rewrite in two years, with the financial thresholds left alone.
02

Four things that did not change

These are the numbers a finance team plans around, and none of them was proposed for amendment.

The de minimis indirect rate: The rate available to entities without a negotiated agreement, raised in the 2024 revision, was not proposed for change, which is covered in close metrics that change behaviour.
The single audit threshold: The federal expenditure level at which a single audit is required was set in the 2024 revision and remains, as the threshold discussion describes.
The equipment threshold: The capitalisation benchmark for federally funded equipment stays where the 2024 revision put it.
Negotiated rate agreements: Existing negotiated indirect cost rate agreements were not disturbed by the proposal.
03

Where the movement actually is

The substantive changes concern the discretionary layer: how agencies review applications, what conditions they may attach, how they may restrict eligibility and how awards may be ended.

For a grantee that translates into award terms rather than accounting policy. The conditions attached to a specific award become the thing to read carefully, and they interact with the expenditure tracking described in master data as the automation project, because an award ending early changes both the reporting obligation and the total expended.

It also raises the practical importance of closeout discipline, because an award that ends earlier than expected leaves costs incurred and a reporting obligation on a short timetable.

None of that is an accounting change and all of it is a finance operations change, which is a distinction worth making explicitly when briefing a board.


The cost principles held steady. The conditions attached to the award are where to look.
04

What to do in each of three positions

The right response depends on how much federal funding you receive and through what route.

PositionPriorityWhy
Direct federal awardsRead award terms carefully at acceptance rather than at closeout.Conditions and termination provisions are where the proposal concentrates.
Pass through fundingConfirm what the pass through entity is imposing on you.Pass through entities frequently add conditions of their own beyond the federal baseline.
Near the audit thresholdTrack expenditure continuously rather than annually.Crossing the threshold is a compliance event with a cost, and it is easy to do accidentally.

This describes a proposal that had not been finalised at the time of writing, and dates and content may change. Confirm the current position with your advisers before acting.

"

The thresholds held. The conditions attached to the money did not.

ChatFin
05

A response that fits a small finance team

Four steps, achievable without external help, which cover the realistic exposure.

Inventory your awards and their terms

Every active award, its conditions, its period and its termination provisions, in one place.

Track federal expenditure monthly

Direct and pass through together, against the audit threshold, so the crossing is planned rather than discovered.

Confirm your indirect rate election

Whether you use a negotiated rate or the de minimis rate, and whether it is applied on every award.

Tighten closeout

Final reporting and liquidation deadlines are short, and they are the obligations most often missed, which is another form of missing documentation.

An accountant working through paperwork with a calculator
Award terms are agreed one at a time, which is where the change reaches you.
06

Two reactions to avoid

Both appear when a rulebook changes twice in quick succession.

Reaction

Rewrite everything again

The cost principles and thresholds were largely untouched, so a full policy rewrite spends scarce capacity on the part that did not move.

Reaction

Ignore it as a proposal

The discretionary layer affects award terms directly, and terms are agreed award by award rather than at the point a rule is finalised.

07

How ChatFin helps grant funded organisations

Grant finance is a tracking and allocation problem with a compliance deadline attached, which is a good fit for prepared work with human approval.

Expenditure tracked by award: Federal expenditure by award and by funding source, drawn from the ledger continuously rather than compiled at year end.
Indirect cost applied consistently: The elected rate applied on the correct base per award, with the calculation visible rather than embedded in a spreadsheet.
Closeout schedules prepared: Final reporting figures assembled with supporting detail for review, in line with treating restricted funds as a dimension.

Compliance positions, rate negotiations and award decisions remain with your team and your advisers.

Free tool

AI Cost Estimator for the CFO Office

Four inputs. A first year range, a timeline, and three delivery models compared. No login required.

Frequently Asked Questions

Did the de minimis indirect rate change?

The proposal published in May 2026 did not propose changes to the indirect cost rate system, and the rate set in the 2024 revision was not amended by it. Confirm the current position with your advisers, since this area has attracted repeated policy attention.

What is the effective date?

The proposal indicated 1 October 2026, following a comment period that closed on 13 July 2026. Proposed dates change during rulemaking, so treat any date as provisional and reconfirm before planning around it.

What should we prioritise?

Award terms and closeout discipline. The financial thresholds and cost principles were largely stable, so a full policy rewrite is not the priority. The conditions attached to individual awards, and the ability to close them out on time, are.

Does this affect pass through funding?

Yes, indirectly. Pass through entities apply the federal framework and frequently add their own conditions. Confirming what your pass through entity requires is often more immediately useful than reading the federal proposal itself.

Read the award, not just the rule

The thresholds held. The conditions moved.

An inventory of awards and terms, continuous expenditure tracking and tighter closeout is a proportionate response that does not consume the capacity you spent on the last revision.

If you want a first year range for automated grant expenditure tracking and allocation, the estimator will produce one before any scoping.

Open the estimator
Book a Demo
Put it on your own numbers

See what this looks like in your ERP.

We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.

✓Runs on the ERP you already have, on the version you already run
✓Every action prepared as a draft that a person approves before it posts
✓A first phase scoped against your real workflows, not a generic package
Schedule a Demo
Confidential & private

This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.

Photos by Mikhail Nilov, free to use under the Pexels License (commercial use, no attribution required).