
Fifteen percent is only money if you claim it
The rate changed, the budget template did not, and the difference has been quietly left with the funder on every award since.
- The 2024 revision raised the de minimis indirect cost rate available to entities without a negotiated agreement.
- The rate applies to modified total direct costs, which has its own definition including limits on how subawards are counted.
- Many organisations still budget at the previous rate because the template and the boilerplate were never updated.
- The election applies to new awards, so the recovery is forward looking and compounds across a portfolio.
- Where a negotiated rate exists it should generally be used, and pass through entities are expected to accept it.
Indirect cost recovery is the least glamorous line in a grant budget and one of the few where a change in a single number moves real money across an entire portfolio.
The 2024 revision to the federal grants framework raised the de minimis rate available to entities that do not have a negotiated agreement.
Two years later a striking number of organisations are still budgeting at the previous rate, because the change reached the regulation and never reached the template. Nobody notices, because a budget built at the lower rate is accepted without comment and the difference never appears as a variance anywhere.
What the de minimis rate is for
Organisations without a current negotiated indirect cost rate agreement may elect a default rate rather than negotiating one, which removes a considerable administrative burden for smaller recipients.
The 2024 revision raised that default, and the proposal published in 2026 did not disturb it, as described in the proposed rewrite.
The rate applies to modified total direct costs, a defined base that excludes certain categories and limits how much of each subaward is included.
Getting the base right matters as much as getting the rate right, because an incorrect base produces a claim that is wrong in either direction.

Four places the old rate survives
The rate is a field in several documents, and updating one does not update the others.
The base is where the errors are
Modified total direct costs is a defined base rather than a synonym for total direct costs. It excludes certain categories and includes only a limited portion of each subaward.
Applying the rate to the wrong base produces either an under recovery, which is a silent loss, or an over recovery, which is a compliance problem.
Because the base is calculated per award and per budget, an error in the template propagates to every application built from it. Correcting it once therefore fixes every future application, which is an unusually good return for an afternoon of work, and the same tracking supports the reporting described in restricted funds as a dimension.
That is why the template is the control point rather than the policy, in the same way that the item master is the control point for margin reporting.
The rate is one number. The base is a definition, and it is where the mistakes live.
Three situations and the right answer
The election is not always the right choice, and knowing which situation you are in takes very little time.
| Situation | Approach | Note |
|---|---|---|
| No negotiated rate | Elect the de minimis rate and apply it consistently. | It is available without negotiation, which is the entire point of it. |
| Negotiated rate in place | Use the negotiated rate. | Pass through entities are generally expected to accept a federally negotiated rate. |
| Actual indirect costs well above the default | Consider negotiating a rate. | Negotiation has a cost and a timetable, so it is worth it above a certain portfolio size. |
Rates, base definitions and eligibility depend on the applicable federal requirements and your circumstances. Confirm with your advisers before changing an election.
The rate is available. Nobody puts it in the budget unless the template says so.
ChatFinRecovering the position
This is a template exercise rather than a project, and the payback starts with the next application.
Check what your last five budgets used
The actual rate applied, taken from submitted budgets rather than from the policy document.
Correct the template and the boilerplate
Both, because a corrected spreadsheet with stale narrative text produces an inconsistency reviewers notice.
Verify the base calculation
Especially the treatment of subawards, which is the most common error and the largest in value.
Quantify what it is worth
Rate difference applied to the coming year's expected direct costs, which is the number that gets the change made, as a measure that changes behaviour.

Two objections from programme teams
Both come up and both have straightforward answers.
A higher rate reduces programme funds
Within a fixed award, yes. Indirect costs are real costs of delivering the programme, and under recovering them shifts the burden to unrestricted funds, which is a worse outcome for the organisation.
Funders will object
The de minimis rate is available under the framework and pass through entities are generally expected to accept negotiated rates. Objections are usually about the narrative rather than the entitlement.
How ChatFin supports indirect cost recovery
The calculation is simple and applying it consistently across a portfolio of awards is where the errors accumulate.
The election, the negotiation decision and the compliance positions remain with your team and your advisers.
AI Cost Estimator for the CFO Office
Four inputs. A first year range, a timeline, and three delivery models compared. No login required.
Frequently Asked Questions
Who can use the de minimis rate?
Recipients and subrecipients that do not have a current federally negotiated indirect cost rate agreement may elect it. Eligibility and the applicable rate depend on the current federal requirements, so confirm your position with your advisers before changing an election.
What is the base it applies to?
Modified total direct costs, which is a defined base excluding certain categories and including only a limited portion of each subaward. Applying the rate to total direct costs instead is the most common error and it usually overstates the claim.
Can we apply it to existing awards?
Generally the election applies going forward rather than retrospectively to awards already agreed. That makes the recovery forward looking, which is why correcting the budget template matters more than revisiting past claims.
Should we negotiate a rate instead?
It depends on how far your actual indirect costs exceed the default and on the size of your federal portfolio. Negotiation carries administrative cost and takes time, so it is usually worth it above a certain scale and not below it.
The rate is available. The budget has to ask for it.
Checking what your last five budgets actually used, correcting the template and the boilerplate together and verifying the subaward base is an afternoon with a portfolio wide payback.
If you want a first year range for automated indirect cost calculation across awards, the estimator gives one in about a minute. The practical test is whether someone outside the team could reach the same answer from the records you keep, which is usually a stricter standard than the one applied internally.
Open the estimatorBook a Demo
See what this looks like in your ERP.
We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.
This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.