A person signing paperwork beside a calculator
Use case · Evidence

An audit trail that separates agent from human

The entry was prepared by software and approved by a controller. In the ledger it shows as one user, and that user is usually an integration account.

Key Takeaways
  • Ledger audit trails record the account that posted, which after automation is frequently an integration user rather than the approver.
  • That obscures the control, because the reviewer's approval happened outside the system that holds the record.
  • Standardised audit trail formats for agent activity remained an unmet requirement in published roadmap material during 2026.
  • The practical answer is to record preparation and approval as separate events with a shared reference.
  • Auditors ask for the approval evidence rather than the posting evidence, and the two are increasingly in different places.

Look at a journal in a modern finance function and ask who created it. The answer in the ledger is a user account, and that account increasingly belongs to an integration rather than to a person.

Somewhere else, in another system, a controller reviewed a proposal and approved it. That is the control. It is also the part the ledger does not know about.

The gap between those two records is where an increasing number of audit conversations now happen.

Audit TrailEvidenceControlsAgent GovernanceReview
01

What the ledger actually records

An ERP audit trail records the identity that performed an operation, the timestamp and usually the before and after values. That is a complete record of the posting.

It is not a record of the decision. When the posting comes through an interface, the identity is the interface, and any human decision preceding it is invisible.

That was tolerable when interfaces carried transactions from other systems, where the control sat in the source system and the ledger was receiving a result. The auditor tested the control where it operated, and the interface was a transport mechanism rather than a decision point.

It is less tolerable when the interface carries a prepared proposal that a person approved, because the approval is the control, as the growth of non human identities has made common.

Two colleagues working with a laptop and calculator in an office
The ledger records the posting identity, which after automation is often an interface.
02

Four events worth recording separately

Together these describe what happened. Recording only the last one describes very little.

Preparation: What was proposed, from which source data, by which process and under which configuration version.
Review: Who examined it, when, and what they saw at the time, which is what the authorisation question turns on.
Decision: Approved, rejected or amended, with the amendment recorded rather than replacing the original silently.
Posting: What reached the ledger, with a reference tying it back to the three events above.
03

Why this is becoming an audit topic

Auditors testing a control need evidence that the control operated. For a prepared and approved entry, that evidence is the approval rather than the posting.

If the approval lives in a workflow tool and the posting lives in the ledger with no shared reference, testing becomes a manual reconciliation between two systems.

That is expensive for everyone, and it produces findings that are about record keeping rather than about the underlying process.

Standardisation would help and it has not arrived. Published roadmap material during 2026 named audit trail infrastructure as one of the unmet enterprise requirements, which puts the responsibility firmly with implementations, and with the way controls over autonomous processes are described.


The approval is the control. If it is not linked to the posting, testing it becomes an exercise in matching two systems.
04

Three record keeping models

Most companies are on the first. The second is achievable now and the third is where this should end up.

ModelHow the evidence sitsTesting cost
Posting onlyThe ledger shows an integration user. Approvals exist in email or a separate tool with no link.High. Every sample requires a manual search in a second system.
Linked referenceThe prepared item carries a reference that appears on the ledger entry.Low. A sample can be traced in both directions without a search.
Unified recordPreparation, review, decision and posting recorded as one chain with a shared identifier.Lowest, and it requires the preparing system to hold the full chain.

Audit evidence expectations differ by environment and auditor. Agree the approach for automated preparation and approval in advance of the period being tested.

"

The ledger knows what posted. It does not know who agreed.

ChatFin
05

Getting to a linked reference

This is achievable in most environments without changing the ERP, and it is the step with the largest return.

Give every prepared item an identifier

Generated at preparation, carried through review and approval, and written into the ledger entry.

Put the identifier in a field auditors can see

A reference or memo field that appears in standard reports rather than a technical field nobody extracts.

Record the reviewer as data

Not in a comment. A field, with a person's identity, so it can be reported on and sampled.

Test the trace in both directions

From a ledger entry back to the approval, and from an approval forward to the entry, which is what explaining a number eventually requires.

Two accountants working at a shared office table
A shared reference turns a two system search into a direct trace.
06

Two arguments against, and the answers

Both are raised and both are surmountable.

Argument

The ledger has no spare field

Almost every ERP has a reference or memo field available on journal headers. Using one consistently is a configuration decision rather than a development project.

Argument

The workflow tool holds it all

It does, until the tool is replaced or the retention period expires. The ledger entry outlives most workflow tools, which is why the reference belongs on the entry, as the sign off question implies.

07

How ChatFin records the chain

This is the part of our design we would most want an auditor to examine, so it is worth setting out plainly.

Four events, one chain: Preparation, review, decision and posting are recorded as linked events with a shared identifier.
The reference reaches the ledger: Entries posted to NetSuite, SAP Business One, JD Edwards, Acumatica, Dynamics 365 or Sage Intacct carry a reference back to the prepared item and its approval.
Amendments preserved: Where a reviewer changes a proposal, both versions are retained, which is what evidence of what an agent actually did requires.

The evidence standard your auditors expect is a matter for them, and it is worth agreeing before the first period rather than after it.

Free tool

AI Cost Estimator for the CFO Office

Four inputs. A first year range, a timeline, and three delivery models compared. No login required.

Frequently Asked Questions

Why does the ledger show an integration user?

Because that is the identity that performed the posting. Where an entry is prepared elsewhere and approved by a person before being posted through an interface, the ledger records the interface, and the human approval sits in whichever system held the review.

What should we do first?

Give every prepared item an identifier and write it into a ledger field that appears in standard reports. That single change converts audit testing from a manual search across two systems into a direct trace in both directions.

Is there a standard for this?

Not yet in any settled form. Roadmap material published during 2026 for the protocol layer connecting agents to tools named audit trail infrastructure among the top unmet enterprise requirements, which means the evidence design currently rests with implementations rather than with a standard.

Do auditors accept approvals held outside the ERP?

Generally yes, provided they can be tied to the posting reliably and retained for the required period. The difficulty is not location but linkage, which is why the shared reference matters more than which system holds the approval record.

Link the two records

The approval is the control. Connect it to the posting.

A shared identifier carried from preparation into the ledger entry is a configuration change that removes most of the audit cost of automated preparation.

If you want a first year range for prepared entries with a full approval chain, the estimator will produce one before any scoping.

Open the estimator
Book a Demo
Put it on your own numbers

See what this looks like in your ERP.

We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.

✓Runs on the ERP you already have, on the version you already run
✓Every action prepared as a draft that a person approves before it posts
✓A first phase scoped against your real workflows, not a generic package
Schedule a Demo
Confidential & private

This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.

Photos by Mikhail Nilov and Pavel Danilyuk, free to use under the Pexels License (commercial use, no attribution required).