
A million dollars is a threshold you cross by accident
Nobody plans to trigger a single audit. It happens because a pass through award counted towards a total nobody was tracking.
- The single audit requirement is triggered by federal awards expended in a fiscal year, at the threshold set in the 2024 revision.
- The count includes funds received directly from agencies and funds received through pass through entities, which is where the surprise usually comes from.
- Expended is the operative word rather than received or awarded, so timing of spend matters more than timing of award.
- A single audit has cost, timetable and preparation consequences that are difficult to absorb late in a year.
- Continuous tracking of federal expenditure across both routes is the only reliable control.
There are two ways to arrive at a single audit. One is to plan for it, budget the cost and prepare the schedule of expenditures through the year.
The other is to discover in month eleven that a pass through award from a state agency counted, that the total crossed the threshold, and that an audit now has to be arranged and paid for.
The second route is common, and it is entirely a tracking failure rather than a compliance one. The organisation did nothing wrong in accepting the funding, and it now has an unbudgeted engagement to arrange in the least convenient part of the year.
What actually triggers the requirement
The trigger is federal awards expended during the fiscal year, measured against the threshold set in the 2024 revision to the framework.
Expended is not the same as received or awarded. A large multi year award may produce expenditure in several years, and the year in which the threshold is crossed depends on spending pattern rather than on award date.
The count includes funds passed through other entities, which is the part most often missed because those awards arrive with the pass through entity's paperwork rather than a federal agency's.
The 2026 proposal did not change the threshold, as noted in the proposed rewrite, so the number set in 2024 remains the planning figure.

Four sources that count and get missed
Each of these is federal money and each arrives looking like something else.
Why late discovery is expensive
A single audit is a defined engagement with a defined scope, and it requires a schedule of expenditures of federal awards prepared to a standard.
Preparing that schedule retrospectively means reconstructing award identifiers, programme numbers and expenditure by award for a full year, from records that were not organised for the purpose.
There is also a market constraint. Auditors with the necessary experience are booked, and a late request in a busy season carries both a premium and a timetable risk. The compliance requirements attached to each programme also have to be understood before testing begins, which is where the award terms discussed in a close that starts before the period ends become directly relevant.
The cost of tracking continuously is close to zero by comparison, which is the same economics as any threshold that accrues quietly.
The audit costs what it costs. Discovering it late costs considerably more.
What to track and how often
Three tracking approaches, and only one of them prevents a surprise.
| Approach | How it works | Outcome |
|---|---|---|
| Annual review | Federal expenditure totalled during year end preparation. | The threshold is discovered after the year has ended, when nothing can be adjusted. |
| Quarterly check | Totals compiled each quarter across direct and pass through funding. | Enough warning to budget and to book an auditor, in most cases. |
| Continuous tagging | Every award tagged at setup, expenditure reported against the total continuously. | The crossing is forecast rather than discovered, and the schedule is a report rather than a project. |
Single audit requirements, thresholds and scope depend on current federal rules and your circumstances. Confirm your position with your auditors and advisers.
The awards were all documented. The total was not being watched.
ChatFinSetting up the tracking
Four steps, achievable in a small finance team, that convert this from an annual risk into a monthly report.
Tag every award at setup
Federal or not, direct or pass through, with the programme identifier recorded at the point the award is entered.
Ask pass through entities for the identifiers
They are obliged to provide the information you need, and asking at award stage is far easier than asking at year end.
Report expenditure against the threshold monthly
A single figure, in the management pack, so the trajectory is visible rather than the total.
Forecast the crossing
Based on planned spend rather than actual, so the decision to budget for an audit is made with time in hand, in the spirit of master data as the automation project.

Two consequences worth planning for
Both follow from crossing the threshold and both take longer than expected.
The schedule of expenditures
It has to be prepared to a standard, by award and programme, which is straightforward if awards were tagged and archaeological if they were not.
Compliance testing
The audit tests compliance with programme requirements, not only the numbers, which draws on programme staff time as well as finance time.
How ChatFin tracks award expenditure
This is a tagging and aggregation problem, which is exactly the kind of thing that fails when it depends on someone remembering.
Audit scope, compliance positions and the engagement itself remain matters for your auditors.
AI Cost Estimator for the CFO Office
Four inputs. A first year range, a timeline, and three delivery models compared. No login required.
Frequently Asked Questions
Does pass through funding count?
Yes. Federal awards expended include funds received directly from federal agencies and funds received through pass through entities such as states, local governments and other organisations. That is the most common reason an organisation crosses the threshold without expecting to.
Is it based on funds received or funds spent?
Expended during the fiscal year. A large award received late in a year may produce little expenditure in that year, and a multi year award may push you over the threshold in the year the spending happens rather than the year it was awarded.
What if we cross it late in the year?
You will still need the audit, and the practical issues are auditor availability, cost and the preparation of the schedule of expenditures. Booking early and reconstructing the schedule immediately are the two things that reduce the damage.
What does the audit actually cover?
Both the financial statements and compliance with the requirements of the federal programmes involved. The compliance element draws on programme staff as well as finance, which is a resourcing point that is easy to underestimate the first time.
The threshold is crossed by spending, not by deciding.
Tagging awards at setup, collecting identifiers from pass through entities and reporting expenditure against the threshold monthly removes the surprise entirely.
If you want a first year range for automated award expenditure tracking, the estimator will produce one before any scoping. The practical test is whether someone outside the team could reach the same answer from the records you keep, which is usually a stricter standard than the one applied internally.
Open the estimatorBook a Demo
See what this looks like in your ERP.
We will walk through the workflow behind this article on the system you already run, using your own data, and show what a first phase would actually cover.
This article is general information for finance and accounting teams. It is not legal, tax, accounting or investment advice. Dates and thresholds are given as published at the time of writing and several of these timelines have moved before, so confirm the current position with your advisers and with the relevant authority before acting.